Chapter Description

This chapter discusses methods for limiting the environmental impact that occurs during the construction of a Data Center through decisions concerning physical location, choice of building materials, landscaping choices and jobsite construction practices.

From the Book

Grow a Greener Data Center
$41.59 (Save 20%)

Summary

When evaluating a potential Data Center site, consider local factors including electrical mix, weather conditions, building codes, and work-force proximity because each of these influence how green your facility can be.
Durable building materials need replacement less often and, therefore, consume fewer resources. Pick materials composed of renewable resources, recycled content, or substances that would otherwise end up in a landfill. Also choose items with less-embodied energy and embodied emissions.
Maintain good air quality by using building components such as paints, carpeting, and office equipment that have little or no volatile organic compounds, and be sure to thoroughly ventilate the building during construction.
Choose energy-efficient building fixtures and appliances such as lighting components, office electronics, power strips, kitchen appliances, and plumbing fixtures.
Insulate the Data Center from external temperatures by placing it at the center of the building. Employing a distributed design for the Data Center's structured cabling requires less cabling, thereby reducing the amount of materials that are consumed, than a direct-connect design.
Several green features can be incorporated into the exterior of your building including highly reflective cool roofs or vegetation-bearing living roofs, each of which reduce heat island effects. A photovoltaic system can also be installed—either on a rooftop or integrated into building surfaces—with its efficiency influenced by location, climate, sun exposure, and air quality.
Landscaping affects the thermal load, water usage, air quality, and other green elements of your building. Choose drought tolerant and low maintenance plants and strategically place trees to shade buildings and parking lots. Irrigate efficiently, use mulch to save water and reduce erosion, allow grass clippings to decompose on lawn areas, limit the use of pesticides, and avoid excess pruning.
Consider photovoltaic installations on the grounds of your site as well. Pervious concrete and porous asphalt allow water to pass through, reducing storm-water runoff and heat islands. You can use a rainwater collection system to gather an alternate source of water for nonpotable uses such as landscaping.
Reduce the environmental impact of your building construction site by establishing separate areas to store materials, unpackage fixtures, sort recyclables, collect salvageable items, and dispose of construction waste. Prohibit construction activity in sensitive portions of the site. Mitigate dust, smoke, and odors; control erosion and wastewater runoff; minimize noise and vibrations; and manage construction waste.
Have your building commissioned to ensure that its infrastructure systems work correctly in conjunction with one another. The scope of commissioning can vary, but systems that are commonly reviewed include HVAC, building management, primary and standby electrical, fire detection and suppression, plumbing, elevators, building envelope, roofing, and voice and data distribution.
You can implement several green design and build approaches just as effectively during the retrofit of an existing Data Center as during construction of a new facility.

Comments

Popular posts from this blog

Timer AC bergantian

Bagaimana sich prinsip kerja AC yang bergantian? Seperti yang terangkai pada ACPDB, yang kita butuhkan adalah 1 buah timer dan 2 buah kontaktor. Pada dasarnya rangkaiannya adalah seperti gambar diatas. Seperti kita ketahui, timer dan kontaktor akan bekerja apabila mendapatkan catuan 220 V. Pada timer catuan bisa dikoneksikan di lubang “L” dan “N”, sedang pada kontaktor dilubang “A1” dan “A2”. Itulah kenapa pada saat mati listrik komponen2 tersebut tidak bekerja. Timer berfungsi sebagai switch dari 2-1 atau 2-3 dan lubang “2” sebagai sumber yang dialiri arus listrik. Sesuai namanya alat ini akan bergantian dari 2-1 atau 2-3 berdasarkan waktu yang sudah kita atur pada sirip biru. Satu sirip merepresentasikan 30 menit. Sedang pada kontaktor untuk tipe Telemecanique, sumbu-sumbu saklarnya adalah 1-2, 3-4, 5-6, NO-NO, NC-NC.  Jika “A1” dan “A2” tidak dicatu maka 1-2 (open), 3-4 (open), 5-6 (open), NO-NO (open), NC-NC (close/terhubung). Dan bila “A1” dan “A2” dicatu  maka 1-2 (close), 3-4 (clo…

Contoh Panduan Standarisasi Area Data Center

Berikut adalah contoh Panduan Standarisasi Area Data Center

PANDUAN - IK Standarisasi Area Data Center Article Number: 49 | Rating: Unrated | Last Updated: Mon, Nov 25, 2013 at 2:13 PM BAB I KEBIJAKAN
1.1.Area Data Center
Areadata center termasuk aset vital perusahaan dan diperlakukan sesuai dengan persyaratan yang telah ditetapkan dalam Sistem Manajemen Pengamanan Perusahaan.

Seksi Jaringan bertanggungjawab terhadap pengamanan fisik dan logik. sedangkan fungsi Sekuriti terhadap pengamanan fisik.


1.2.Pertimbangan Dalam Hal Penentuan Lokasi Area Data Center
Beberapa pertimbangan yang harus ada dalam menentukan lokasi ruang data center, yaitu :

1.Memungkinkan untuk pengembangan yang memadai, misalnya mempertimbangkan pengembangan untuk jangka waktu 5 (lima) tahun ke depan.
2.Mempertimbangkan ruang yang tidak "terlalu” banyak dilalui untuk operasional lain, namun tetap dapat dijangkau dengan mudah.
3.Memperhatikan aspek keamanan dan keselamatan pekerja.
4.Memenuhi persyaratan sebagaimana yang …

Mendesigns dan Menghitung UPS untuk Data Center

Mendesigns dan Menghitung UPS untuk Data Center UPS dan data center mungkin bisa di sebut sayur tanpa garam, hambar jika tidak saling melengkapi. 
Tapi untuk menentukan kebutuhan akan UPS data centerperlu perhitungan yang matang agar UPS dan server tetap awet dan selalu ON 24 jam. banyak sekali jenis UPS dan daya yang di tawarkan. Kita harus menghitung kebutuhan beban keseluruhan server agar ketika listrik down UPS dapat menghandle beberapa detik untuk listrik pindah ke genset begitu pula sebaliknya, Oke untuk menentukan itu semua tentukan dulu jenis UPS yang akan anda gunakan.
Oke kita sedikit belajar dulu tentang UPS :)
PRINSIP KERJA UPS Setiap PC membutuhkan daya listrik. Apabila aliran listrik (main power) terputus, PC akan mati (tidak berfungsi). Fungsi dasar UPS (Uninterruptible Power Supply) adalah menyediakan suplai listrik SEMENTARA ke beban (PC) tanpa terputus pada saat main power tidak bekerja agar seluruh proses dapat dihentikan dengan benar, seluruh data dapat disimpan den…