Salah satu strategi penghematan seputar data center adalah penggunaan / pendekatan container data center.

Stop fixing every equipment failure in the data center

As the number of servers, storage arrays and network equipment continues to grow, equipment failure is unavoidable. IT pros must consider different ways to come to grips with this guarantee of failure.
The next generation of data centers could use a fragile IT methodology -- knowing that equipment will fail but architecting to accept that failure with minimal human intervention. While an N+M (primary plus multiples for backup) architecture requires someone to replace or repair the failed equipment, fragile IT leaves failed equipment in place and ensures it doesn't draw power or drain the overall system performance.

Where a modular approach works

If you're aiming for a technical data center technology platform that will last three years, you have to make sure your plan for the installed platform can support the workloads envisaged over that time. This approach is nearly impossible in reality, so taking a modular approach is best.
A modular approach uses engineered racks and rows that can be replicated fairly easily, as well as a rolling lifecycle. Nearly one third of equipment is replaced annually to maintain a modern platform.
For example, imagine a data center with 3,000 servers, each of which has a direct attached storage (DAS) and 300 network switches with afabric network approach. Due to expected workload growth, IT plans to increase server and storage numbers by 10% per year. Therefore, they will have 3,300 servers by the end of year one, 3,630 by the end of year two and 4,000 by the end of year three.
On a yearly basis, this data center is replacing upwards of 1,000 servers, 1,000 hard disk drives and 100 network switches.
Now, factor in predicted failure rates. Network switches are the least prone to failure. Servers and storage systems, while being pretty robust, will lose several boxes throughout the expected three-year lifecycle.
Understand your organization's risk profile to implement a fragile IT platform. In high-workload environments, it's possible that 5% to 10% of servers and hard drives could fail in one year. Therefore, for an organization with no room for error, build in enough extra hardware (N+M) to leave the headroom to manage without failed systems.
If you have 1,000 servers and grow at 10% annually, with a failure rate of 10% per year, engineer for 1,542 servers and storage devices with 44 network switches. This platform should be able to last three years without the need for any human intervention. It caters to failures without outages, and growth alongside workload needs.
This built-in excess capacity won't use energy when the server is switched off, but can be turned on in the event of a failure. It can also meet any unexpected workload spikes.

Benefits of the fragile equipment mindset

As IT equipment prices decrease, the cost of human intervention increases. Paying a technician to remove and replace a $1,500 server could cost more than the server itself, when all costs are factored in along with the risk of error during the installation.
Hardware vendors are looking at how to offer fragile IT systems. Today, containerized systems pack all IT equipment into a standard shipping container. Prior to use, the organization plugs in power and data connections to the container and carries out simple configurations.
A container-based approach combined with above-average operating temperatures produces higher than normal equipment failure rates, which fragile IT offsets. The business can buy and use a container with zero human intervention, which is cost effective. Containers minimize cooling and real estate costs. Once the lifecycle is completed, the original vendor can refurbish the container or strip it bare and refill it with new equipment to use elsewhere.
Deployment speed improves with fragile IT in modular set ups. Data centers run completely lights out, with system management based far more on the performance of the platform, rather than dealing with the tasks of hardware maintenance and repairs. The business receives a platform with far greater availability, and IT teams can concentrate on strategic tasks.
Break with your visceral fears. Embrace the fact that IT is fragile; engineer to manage it.
About the authorClive Longbottom is the co-founder and service director of IT research and analysis firm Quocirca, based in the U.K. Longbottom has more than 15 years of experience in the field. With a background in chemical engineering, he's worked on automation, control of hazardous substances, document management and knowledge management projects. Clive.Longbottom@quocirca.com

Comments

Popular posts from this blog

Timer AC bergantian

Bagaimana sich prinsip kerja AC yang bergantian? Seperti yang terangkai pada ACPDB, yang kita butuhkan adalah 1 buah timer dan 2 buah kontaktor. Pada dasarnya rangkaiannya adalah seperti gambar diatas. Seperti kita ketahui, timer dan kontaktor akan bekerja apabila mendapatkan catuan 220 V. Pada timer catuan bisa dikoneksikan di lubang “L” dan “N”, sedang pada kontaktor dilubang “A1” dan “A2”. Itulah kenapa pada saat mati listrik komponen2 tersebut tidak bekerja. Timer berfungsi sebagai switch dari 2-1 atau 2-3 dan lubang “2” sebagai sumber yang dialiri arus listrik. Sesuai namanya alat ini akan bergantian dari 2-1 atau 2-3 berdasarkan waktu yang sudah kita atur pada sirip biru. Satu sirip merepresentasikan 30 menit. Sedang pada kontaktor untuk tipe Telemecanique, sumbu-sumbu saklarnya adalah 1-2, 3-4, 5-6, NO-NO, NC-NC.  Jika “A1” dan “A2” tidak dicatu maka 1-2 (open), 3-4 (open), 5-6 (open), NO-NO (open), NC-NC (close/terhubung). Dan bila “A1” dan “A2” dicatu  maka 1-2 (close), 3-4 (clo…

Pemilihan jenis modul AMF (Automatic Main Failure)

Pemilihan jenis modul AMF (Automatic Main Failure)

Dari sekian banyak jenis modul yang ada dipasaran, kami menawarkan beberapa alternatif untuk jenis modul AMF yang dapat kami sediakan. antara lain menggunakan modul dari DEEPSEA, smart relay atau timer. tentunya dengan beragam pilihan tersebut ada beberapa keuntungan atau kelebihan dari masing masing modul tersebut. sebagai misal menggunakan modul AMF dari DEEPSEA akan sangat cocok jika modul ini dapat berinterakasi langsung dengan genset. terutama jika mesin genset belum dilengkapi genset controller dan masih mengandalkan panel genset manual. untuk pabrikan genset sekarang ini pada panel genset sudah dilengkapi dengan AMF, sehingga tidak perlu panel AMF - ATS dengan menggunakan modul DEEPSEA atau sejenisnya. sehingga dalam pemilihanya dapat menggunakan timer, smart relay atau produk lain seperti ATS controller C20 dari socomec.


Modul DEEPSEA 4420

AMF Module DSE 4420 Modul ini memiliki banyak fitur antara lain ; Start / stop gensetDigital …

Contoh Panduan Standarisasi Area Data Center

Berikut adalah contoh Panduan Standarisasi Area Data Center

PANDUAN - IK Standarisasi Area Data Center Article Number: 49 | Rating: Unrated | Last Updated: Mon, Nov 25, 2013 at 2:13 PM BAB I KEBIJAKAN
1.1.Area Data Center
Areadata center termasuk aset vital perusahaan dan diperlakukan sesuai dengan persyaratan yang telah ditetapkan dalam Sistem Manajemen Pengamanan Perusahaan.

Seksi Jaringan bertanggungjawab terhadap pengamanan fisik dan logik. sedangkan fungsi Sekuriti terhadap pengamanan fisik.


1.2.Pertimbangan Dalam Hal Penentuan Lokasi Area Data Center
Beberapa pertimbangan yang harus ada dalam menentukan lokasi ruang data center, yaitu :

1.Memungkinkan untuk pengembangan yang memadai, misalnya mempertimbangkan pengembangan untuk jangka waktu 5 (lima) tahun ke depan.
2.Mempertimbangkan ruang yang tidak "terlalu” banyak dilalui untuk operasional lain, namun tetap dapat dijangkau dengan mudah.
3.Memperhatikan aspek keamanan dan keselamatan pekerja.
4.Memenuhi persyaratan sebagaimana yang …