The Top 9 Mistakes in Data Center Design & Planning

 










Data Center Design & Planning – Introduction
Many businesses operate outside of safe capacity thresholds with little or no room to expand. According to the IDC, the average data center is 9 years old. However, Gartner states that any site more than 7 years old is obsolete. Overcrowded or obsolete data centers create a roadblock for growing organizations and building a new data center(s) is sometimes the only solution. While speed-to-market is critical to success, companies that fail to assess their business needs properly will create dead-end data centers that will not deliver uptime performance goals or meet future business needs
How can you avoid making major mistakes when entering the build and expansion world?

The key lies in the methodology you use to design and build your data center facilities. All too often, companies base their plans on watts per square foot, cost to build per square foot, and tier level—criteria that may be misaligned with their overall business goals and risk profile. Poor planning leads to poor use of valuable capital and can increase operational expense.

Many organizations get overwhelmed, focusing on “speeds and feeds,” green initiatives, concurrent maintainability, power usage effectiveness (PUE) and Leadership in Energy and Environmental Design (LEED) certification. All of these criteria are critical in the decision making process. However, the details often overshadow the big picture. Most companies miss the business opportunity in a data center expansion—an expansion driven by a holistic approach.

While there are numerous consultants in the field to help you find your way, assessing ideas and input can be overwhelming. Organizations with critical capacity requirements in the 1-3 megawatt range may fall into this risk category. The critical nature of mid-size users is no less important than mega users; however internal technical expertise to drive proper expansion plans may be limited. The result is information overload from multiple sources, leading to confusion and poor decision making.

“Data center owners have so many problems right now. Their assets are mission critical, but they are out of control. Power consumption is costing them a fortune. They can’t cool what they have got and cut the risk of a catastrophic outage. And if they make an investment, by the time it is built, it is already out of date” – Stanford Group

Mistake 1: Failure to take total cost of ownership (TCO) into account during the data center design phase

Focusing solely on capital cost is an easy trap; the dollars required to build or expand can be staggering. Capital cost modeling is critical, but if you have not included the costs to operate and maintain (OpEx) your business-critical facilities infrastructure, you have severely shortchanged the overall process of effective business planning.

There are two critical components required to build data center OpEx cost modeling—the maintenance costs and the operating costs. The maintenance costs are the costs associated with the proper maintenance of all critical facility support infrastructure. They include but are not limited to OEM equipment maintenance contracts, data center cleaning expenses and subcontractor costs for remedial repairs and upgrades. The operating costs are the costs associated with daily operation and on-site personnel. They include but are not limited to staffing levels, personnel training & safety programs, the creation of site-specific operations documentation, capacity management, and QA/QC policies and procedures. If you have failed to calculate a 3-7 year operations and maintenance (O&M) expense budget, you cannot build a return on investment (ROI) model that supports smart business decisions

If you are planning to build or expand a business-critical data center, your best approach is to focus on three basic TCO parameters: 1) capital expense, 2) operations and maintenance expense, and 3) energy costs. Leave any component out, and you will run the risk of creating a model that does not correctly align your organization’s risk profile and business expenditure profile. If you are making a decision about whether to “buy” (use of collocation/hosting) or do an internal build, the risk of not taking this TCO approach is magnified significantly.
Figure 1: Components of a successful data center business plan

“The global multi-tenant datacenter market has shown remarkable growth in the past 12 months. Demand is up 14% on a global basis, while supply is up only 6%, exacerbating an already lopsided supply demand curve” – Tier 1 Research


Mistake 2: Poor cost-to-build estimating
Another common mistake is the estimate itself. Financial requests made to boards of directors for capital to expand or build a data center are often too low and result in failure. The flow of decision-making looks something like this:
  • The capital request is made and tentatively approved. Financial resources are allocated to investigate, capture and create a true budget.
  • Time is spent driving the above budget process.
  • The findings reveal that the initial budget request is too low.
  • The project is delayed. Careers are impacted, and the ability to deliver service to internal and external clients and prospects is impacted.
  • This takes you full circle, back to the # 1 Biggest Mistake: Failure to take the TCO approach and build a holistic financial model.
Cost to build issues can be easily avoided, but are destined to fail if you fall into trap #3

“Organizations with critical capacity requirements in the 1-3 megawatt range may fall into this risk category” – Mike Manos, Industry Expert

Mistake 3: Improperly setting design criteria & performance characteristics

There are two missteps that can put your organization in the overspend death spiral. First, everyone wants a Tier 3 design, but not everyone needs one. Second, most visions of kilowatt per square foot or rack are not supported by actual business requirements. Too many times, the “must have 300 watts per square foot” approach may not be justified. Don’t overbuild; it is a waste of capital. Higher tier facilities also lead to higher O&M and energy costs. This sets the entire foundation for a proper business model and ROI off-base. Establish the right design criteria and performance characteristics first. Then build your capital expenses and operational expenses around it. Make sure to get your design criteria right and your financial model set prior to visiting the board of directors. For more information on design parameters see White Paper 142, Data Center Projects: System Planning.

Figure 2: Determining Data Center Design criteria & Performance characteristics








Mistake 4: Selecting a site before design criteria are in place

Organizations often start searching for the perfect space to build before having their design criteria and performance characteristics in place. Without this vital information, it doesn’t make sense to spend time visiting or reviewing multiple sites. This typical “cart before the horse” scenario happens most frequently with users in the 1-3 megawatt range. While mega users are usually experts in this arena, and take into consideration power availability and cost, fiber, geographic issues such as earthquakes, tornados and flood plains, etc., baseline users often have business models that dictate a need to build or renovate a shell in their core region of business. The problem with selecting a site prematurely or based on narrow geography is that the site often cannot meet the design requirements. For instance, having your data center two floors below your high-rise office or even two blocks away is convenient, but business-critical data centers require a long list of site criteria that usually cannot be met in a multitenant space without significantly higher build costs or limiting space for future expansion. White Paper 81, Site Selection for Mission Critical Facilities, provides more information to help avoid this big mistake. Some organizations base their site search criteria on the amount of raised floor required to house their critical IT infrastructure. This can lead to the next big mistake

“While the physical design of a datacenter is critical, how a site is operated and maintained plays a more significant role in achieving site availability”

Mistake 5: Space planning before the data center design criteria is in place

The amount of space to house the data center facility infrastructure components can be significant. In the most robust of systems, the ratio of raised floor to support gear could be as high as 1 to 1. Many organizations base their space requirements on IT equipment alone. However, mechanical and electrical equipment require a significant amount of space. In addition, many organizations overlook the square footage required to house office space, equipment yards and IT equipment staging areas. Therefore, it is absolutely critical to determine your design criteria before you develop your space plan. Without it, there is no way to conceptualize the total space required to meet your overall needs.

Mistake 6: Designing into a dead-end

The data center industry has done a good job of promoting the importance of modular designs. However, using the modular approach doesn’t guarantee success. Modular approaches are based on adding “chunks” of additional infrastructure equipment in a “just-in-time mode” to preserve capital. Organizations still “dead-end” themselves by using the wrong crystal ball when guessing about future needs. Everything can and will change. Designs that are modular and flexible are the key to long term success. Even the best kilowatt per square foot/rack planning can be obsolete due to consolidation, exponential business growth via acquisition, or a sharp turn to an unplanned high density footprint. Electrically, you should make sure that your design includes the ability to add UPS capacity to existing modules without an outage. Design your input and output distribution systems to accommodate any future change in your base build criteria. The cost to oversize distribution for future capacity needs is not significant in your overall TCO modeling. Mechanically, most users can meet their cooling requirements via conventional perimeter cooling with the proper floor height and hot/ cold isle planning. However, one high-density rollout can change everything. Make sure your core design allows for the flexible (uninterrupted) implementation of custom in-rack/in-row cooling solutions.

Mistake 7: Misunderstanding PUE

Power Usage Effectiveness (PUE) is an effective tool to drive and measure efficiency. However, broad energy efficiency claims may lead to significant misunderstanding. In nearly all situations for new builds and expansions, there is a capital cost related to gaining lower PUE. Many times, organizations set a PUE goal with all the proper intentions but the calculation does not take into account all factors that should be considered. You need to fully understand what the ROI is on capital expenses to reach your goals. You need to ask yourself, what is the TCO relative to the target PUE?

There are many ways to illustrate and understand the breakdown of the balance between PUE, ROI and TCO. Here are three cautionary examples that represent a failure or misunderstanding:
  • What was the “design criteria day” for the calculation? Was it calculated or measured on the “perfect day”? Or, was the calculation based on a yearly average?
  • Was the calculation based on a fully loaded or partially loaded data center operating condition? All equipment efficiency curves change based on load profiles. PUEs change daily, if not hourly, in true operating conditions.
  •  Finally, there is an ongoing debate regarding the efficiencies of water-cooled chillers and air-cooled chillers. Each application has multiple options for “free cooling” or “economizer” applications to lower PUE. For this example, when making your TCO/ROI business decision, you must ask yourself the following question: What is the cost of the make-up water and water treatment maintenance requirement for the water cooled solution? Recognize that a typical 2 megawatt data center using water cooled towers will require 50 to 60,000 gallons of make-up water per day.
Use PUE to your advantage to meet your overall business goals, but be cautious. Try not to get trapped into misusing the calculation formula to justify overall capital expense and operating expense budgets.

The Data Center Efficiency Calculator TradeOff Tool™ provides a quick means  of estimating data center PUE for various power and cooling architectures





Mistake 8: Misunderstanding LEED certification

To date, the U.S. Green Building Council (USGBC) has not set specific criteria for data center LEED criteria. However, certification can be obtained using the Commercial Interiors Checklist (http://www.usgbc.org/Showfile.aspx?DocumentID=5723). There are three basic missteps that take place:
  • Failure to develop a base understanding of the qualifying criteria. T his can be remedied by viewing the above referenced document.
  • Pursuing LEED certification as an afterthought. Obtaining LEED certification begins at the design concept and ends with a formal certification after project completion. Engage a qualified LEED professional or consulting firm at the start of the planning process.
There will be costs related to receiving certification. Failure to take these related expenses into account will impact your TCO and business decision planning processes

Mistake 9: Overcomplicated designs

As stated earlier, simple is better. Regardless of the target tier rating you have chosen, there are dozens of ways to design an effective system. Too often, redundancy goals drive too much complexity. Add in the multiple approaches to building a modular system and things get complicated fast.

When engaging internally or with your chosen consultant, the number one goal should be to keep it simple. Why?

  • Complexity often means more equipment and components. More parts equal more failure points.
  • Human error. The statistics are varied, but consistent. Most data center drops are due to human error. Complex systems increase operational risk.
  • Cost. Simple systems are less costly to build
  • Operations and maintenance costs. Again, complexity often means more equipment and components. Incremental O&M costs can increase exponentially.
  • Design with the end in mind. Many designs look good on paper. It is easy for you or your consultant to justify the chosen configuration and resulting uptime potential. However, if the design does not consider the “maintainability” factor when operating or servicing, the system’s uptime and personnel safety will be compromised.
Although many data center designs, builds and expansions result in failure, yours doesn’t have to. By avoiding the top 9 mistakes outlined in this paper, you will be well on your way to achieving success. In summary:

1. Start with a Total Cost of Ownership approach
• Evaluate your risk profile against your business expense profile
• Create a model that incorporates CapEx, OpEx and energy costs

2. Determine your design criteria and performance characteristics
• Base this criteria on your risk profile and business goals
• Allow those criteria to truly determine the design, including tier level, location and space plan—not the other way around

3. Design with simplicity and flexibility
• Use a design that will meet your uptime requirements, but will also keep costs low during construction and throughout operation—simplicity is key.
• Accommodate unplanned expansion by incorporating flexibility into the design

4. If PUE and LEED are part of your criteria, become educated on the common misunderstandings and expenses associated with each.

Through proper planning using the TCO approach, you can create a data center facility that meets your organization’s performance goals and business needs today and tomorrow.

Sumber : www.se.com

Kami memastikan data center dan ruang server anda bekerja optimal dengan :
  1. Mengukur daya resource yang digunakan (Data Center Infrastructure Management)
  2. Memastikan perkabelan yang baik dan terdata (Cabling Restructure & Documentation)
  3. Memastikan penggunaan Pendingin yang baik
  4. Melakukan pemasangan & perawatan AC PRESISI 
  5. Melakukan pemasangan & perawatan FM 200 / FIREPRO Fire Extinguisher
  6. Menggunakan Environment Monitoring System (EMS) AKCP
  7. Melakukan pemasangan Timer AC Split

Kami membantu melakukan pemasangan :
  1. Kabel Fiber Optic Singlemode / Multimode untuk area pabrik, perkantoran 
  2. Kabel UTP / STP / FTP 
  3. Kabel Sensor 
  4. Kabel Listrik / Eletrical 
  5. Panel Listrik 
  6. Pemasangan Akses Door 
  7. Pemasangan CCTV

Silahkan hubungi Tim kami untuk mendapatkan penawaran Terbaik terkait kebutuhan anda.
HUBUNGI KAMI: dcim@dayaciptamandiri.com

Comments

Popular posts from this blog

Cara Menghitung Satuan Volt, Ampere, dan Watt

Sangat penting untuk mengetahui satuan dalam bidang yang ingin anda pahami, dalam bidang listrik untuk mengetahui satuan seperti volt, ampere, dan watt. Ketika anda tidak mengetahui satuan dari bidang listrik ini sama saja dengan tidak tahu dalam teori dasar dan anda sekarang bisa memperlajari dengan jelas dalam artikel saya berikan ini. Saya akan memberikan langkah demi langkah agar mudah untuk dipahami. Pengertian Volt (Voltage) Volt (Voltage) adalah standart satuan listrik yang menunjukan atau menerangkan sebuah nilai tegangan dalam listrik. Volt atau bisa disebut tegangan hanya bisa diukur dengan alat yang bernama voltmeter atau multitester, volt mempunyai bermacam-macam nilai tegangan dan juga tipe atau karekter yang berbeda. Volt Mempunyai 2 tipe atau karakter Volt atau tegangan listrik ini mempunyai jenis 2 tipe yaitu tegangan AC atau bisa disebut tegangan bolak-balik. kemudian tegangan DC (Direct Current) atau bisa disebut dengan tegangan searah. Untuk mengatahui apa itu tegan

Cara Menghitung Ampere Motor 3 dan 1 Phase dengan Rumus Daya

Sering kali, anda menjumpai motor listrik untuk menggerakan mesin pada pabrik - pabrik sekarang dan kebanyakan 85% didalam pabrik menggunakan motor listrik untuk menggerakan mesinnya. motor listrik ada 2 jenis Phase yang pertama adalah 3 phase yang di mana ada tegangan R S T sedangkan yang ke dua adalah 1 Phase dimana motor listrik hanya diberi tegangan phase dan Netral aja, contohnya seperti pumpa air dirumah.     Dari motor - motor tersebut maka anda sangat perlu untuk menghitung amperenya dimana anda membeli motor 1 phase tapi kapasitas rumah anda hanya 450 Watt saja maka anda harus menghitung motor airnya harus di bawah dari 450 Watt. Plate Motor 1 Phase  Diatas adalah name plate motor 1 phase dimana   sudah di ketahui KW dan Amperenya jika hanya di   ketahui KWnya saja bagaimana seperti berikut   menghitungya:  Diket : P : 8 KW = 8 x 1000 = 8000 Watt V : 220V Ditanya : Berapa Nilai Amperenya? Rumus daya  Motor 1 Phase: P = V x I I  = P/V Keterangan : P  : Daya ( Watt ) I   : Arus

Alat - Alat Fiber Optic dan Fungsinya

1. Fusion Splicer Fusion splicer atau sering dikenal sebagai alat untuk menyambungkan serat optik ini merupakan salah satu alat yang digunakan untuk menyambungkan sebuah core serat optik, dimana serat tersebut terbuat / berbasis kaca, dan mengimplementasikan suatu daya listrik yang telah dirubah menjadi sebuah media sinar berbentuk laser. Sinar laser tersebut berfungsi untuk memanasi kaca yang terputus pada core sehingga bisa tersambung kembali dengan baik. Perlu kalian ketahui, bahwa fusion splicer ini haruslah memiliki tingkat keakuratan yang cukup tinggi, hal ini ditujukan untuk menghasilkan hasil penyambungan yang sempurna, karena pada saat penyambungan tersebut akan terjadi proses pengelasan media kaca serta peleburan kaca yang akan menghasilkan suatu media, dimana media tersebut akan tersambung dengan utuh tanpa adanya celah-celah, hal ini dikarenakan media tersebut memiliki senyawa yang sama. 2. Stripper Atau Miller Sama seperti kabel - kabel yang lain, salah satunya seperti kab

Cara Menentukan Ukuran Kabel Instalasi Listrik

Dalam sebuah instalasi listrik di sebuah rumah atau bangunan, penggunaan kabel listrik haruslah diperhatikan betul. Mengingat kesalahan penggunaan dan pemasangan kabel dapat membahayakan manusia atau penghuni rumah. Dalam menggunakan sebuah kabel ini dari anda harus tahu jenis kabel yang akan di pasang, berapa ukuran kabel listrik, luas penampang maupun panjang kabel listrik. Ukuran Kabel Listrik Seperti yang kita ketahui bersama bahwa fungsi sebuah kabel listrik adalah untuk menghantarkan arus listrik dari sumber listrik menuju beban daya suatu alat listrik. Yang dimaksud dengan ukuran kabel lisrik adalah luas penampang kabel . Sehingga setiap ukuran kabel listrik akan menggunakan satuan mm2 . Mengapa menggunakan ukuran kabel yang tepat sangat penting ? karena kesalahan dalam penentuan ukuran kabel dapat menyebabkan resiko yang fatal. Beberapa kode yang sering ditemukan pada sebuah kabel listrik yaitu : 1 X   1,5 mm 1 X   2,5 mm 2 X   1,5 mm 2 X   2,5 mm Keterangan : Angka sebelum kal

Fungsi dan Cara Setting MCCB ( Moulded Case Circuit Breaker )

Mengulas lebih dalam tentang MCCB - dunia listrik sangat banyak sekali peralatan listrik sebagai pengaman untuk keselamatan dari bahaya listrik maupun untuk mengamankan sebuah motor dan peralatan listrik lainya dari bahaya short circuit. Apa itu MCCB ? MCCB adalah singkatan dari Moulded Case Circuit Breaker, sebagai pengaman terjadinya hubung singkat short circuit dan beban lebih overload agar tidak terjadinya kerusakan pada motor listrik maupun kebakaran yang disebabkan oleh short circuit yang selalu menimbulkan bunga api. MCCB biasanya digunakan oleh industri karena MCCB hanya untuk pengaman listrik 3 phase, dan motor listrik industri juga menggunakan listrik 3 phase, jadi jika anda ingin bertemu apa itu namanya mccb dan dan digunakan untuk apa mampir deh pabrik terdekat dan minta tolong untuk dilihatkan apa itu mccb. Pole MCCB Mccb memiliki macam – macam pole: 1 Pole, 2 Pole, 3 Pole, 4 Pole Mccb memiliki macam – macam kA: 36kA, 50kA, 85kA, 100kA Karakter MCCB - Hanya menggunakan 3 p

Perbedaan Antara KW, KVA, KWH, KVAr

Apa definisi KVA, KW, Watt, KWH, KVar, dan apa perbedaannya? Mungkin kita pernah menjumpai satuan listrik yang terkadang ditulis dengan menggunakan Watt, KW, atau KVA, Dan ini sering menjadi pertanyaan bagi kita, apa sebenarnya perbedaan satuan KW dan KVA, dan berapa 1 kVA, atau mungkin berapa itu 1 KVA KW? Selain itu kita juga sering mendengar istilah KWH, maka pertanyaannya, 1 KWH berapa Watt, atau 1 Kw berapa KWH? Untuk menjawab pertanyaan tersebut, berikut penjelasan mengenai apa yang dimaksud dengan KVA, KW, Watt, KWH, Kvar, dan apa perbedaannya. Apa yang dimaksud dengan KVA, KW, KVAr, dan KWH? Dalam listrik tiga fasa, terdapat 3 jenis daya listrik yang disebut juga dengan segitiga daya, yaitu: Daya Semu (KVA) Daya Aktif (KW) Daya Reaktif (KVAr) KVA KVA (Kilo Volt Ampere) untuk daya listrik yang tidak terlalu besar biasanya cukup menggunakan satuan daya VA (Volt Ampere). 1 KVA = 1000VA KVA adalah satuan daya listrik yang diperoleh dari perhitungan rumus daya, atau biasa disebut de

Jenis Kabel Listrik beserta Fungsi dan Gambarnya

Berbicara mengenai kabel listrik tentu sangat luas sekali. Kabel listrik sendiri merupakan komponen yang memiliki peran vital dalam berbagai peralatan elektronik yang kita gunakan sehari-hari. Dari kegunaannya, jenis-jenis kabel listrik ini sangat banyak dan beragam. Pemakaian jenis kabel pun harus tepat agar tidak menyebabkan konsleting listrik. Untuk itu penting sekali mengetahui jenis jenis kabel listrik berikut ini. Kabel listrik Kabel listrik merupakan sebuah komponen konduktor yang berfungsi untuk menghantarkan arus listrik ke benda-benda atau peralatan yang membutuhkan energi listrik agar dapat bekerja. Meskipun jenis-jenis kabel listrik sangat banyak, tetapi pada umumnya setiap kabel listrik terdiri dari dua bagian utama, yakni bagian isolator dan bagian konduktor. Bagian-bagian Kabel Listrik Pada kabel listrik, bahan isolator merupakan bahan yang tidak dapat menghantarkan arus listrik. Pada isolator terdiri dari pembungkus kabel yang memiliki fungsi sebagai pelindung (agar tid

Inside the Box: UCLA's New Portable Data Center

When UCLA found out that a planned upgrade to its brick and mortar data center was going to surpass the original budget estimate by several million dollars, it began thinking "inside the box"--and chose cargo-container computing. By Dian Schaffhauser 08/11/11 The latest and potentially most powerful research data center at the University of California Los Angeles (UCLA) was delivered on the back of a flat bed truck from Austin, TX. It was put in place with a crane. The facility resembles the kind of container used to run portable recycling centers. But when it's fully loaded and performing research in physics, economics, genomics, and biochemistry, among other disciplines, the Performance Optimized Datacenter, or POD, will support more than 1,500 compute nodes. This far exceeds the campus' traditional "brick and mortar" data centers in sheer computing power, and yet it fits into a compact space of 40' x 8'. The story of UCLA&#

MENGENAL PANEL LISTRIK , JENIS DAN SPESIFIKASINYA

Pengertian Panel Listrik Panel listrik adalah suatu benda berbentuk kubus dengan berbagai ukuran ataupun bervariasi dengan sebelah sisi dibuat lubang selebar hampir sama dengan belakangnya, dan nantinya di baut penutup seperti daun pintu agar bisa dibuka dan ditutup, dan didalam panel tersebut terdapat papan yang dikaitkan dengan sisi belakang pintu di pakai baut yang nantinya papan tersebut dapat dilepas dan dipasang kembali. Pada umumnya panel listrik adalah terbuat dari plat besi dengan ketebalan 0,5 – 1 mm. Biasanya disesuaikan dengan ukuran atau besarnya panel, dan nantinya papan tersebut yang akan digunakan tempat pemasangan komponen-komponen listrik. Fungsi Panel Listrik Fungsi dari panel listrik adalah untuk menempatkan komponen listrik sebagai pendukung dari mesin-mesin listrik agar bisa beroperasi  sesuai dengan prinsip kerja dari mesin listrik itu sendiri. Untuk mengamankan komponen listrik supaya terlindungi dari pengaruh di sekelilingnya. Untuk menata komponen atau rangkai

Pengertian Konektor RJ45 dan Fungsinya Lengkap

 RJ45 adalah konektor kabel ethernet yang kebanyakan memiliki fungsi sebagai konektor pada topologi jaringan komputer LAN (Local Area Network) dan topologi jaringan lainnya. RJ itu sendiri adalah singkatan dari Registered Jack yang merupakan standard peralatan pada jaringan yang mengatur tentang pemasangan kepala konektor dan urutan kabel, yang digunakan untuk menghubungkan 2 atau lebih peralatan telekomunikasi (Telephone Jack) ataupun peralatan jaringan (Computer Networking). Juga merupakan suatu interface fisik dari jaringan kerja (network) , untuk kegunaan telekomunikasi dan komunikasi data. Konektor RJ45 memiliki fungsi untuk memudahkan penggantian pesawat telpon atau memudahkan untuk di pindah-pindah serta mudah untuk di cabut tanpa khawatir tersengat aliran listrik dan menghubungkan konektor LAN melalui sebuah pusat network. Konektor RJ45 memiliki 8 buah pin. Pin pertama terdapat di paling kiri apabila pin RJ45 menghadap ke anda, di ikuti pin nomor 2, 3, 4 dan seterusnya. Cara pe